|
|
|
|
---|
Friday, August 28, 2009
Remodeling - Day Five
Another early day, got lots moved over as we packed up Harry's truck every time we go up. Once there we did a second coat on the Guest Bedroom and did a first coat on the Guest bathroom. Also our contractor Danny stopped by to pick up the tile and go over other construction things, as he is starting on Monday at 6am. We talked about the fireplace and he suggested putting wood over it to make it look more rustic as this was something I wanted and I loved the idea.. so now we are doing that also. So construction wise we are getting the office windows drywalled up. getting the carpet taken up and tile laid down in the master bathroom. Removing the two side closet built-in's in the master bedroom and having the fireplace re-faced and tiled. Along with Harry and I painting every room. Today while at our new place the air got so smokey you would think that there were fires all round us, but fortunately they were miles away and the wind was blowing our way. I had to drive home to grab my check book and had to drive through a down pour of ash. Harry also said there was ash falling at our house. It's a fact of living in the hills that fire are fairly common.. let's just hope they are never close to us. So things are moving along nicely.. hopefully in a few weeks everything will be done and by that time almost everything will be moved over to the new house so we can set everything up and move in full time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment